Road Closure - message from AT
Friday, 13th February 2026 at 9:40am
AT Engagement (AT) has provided the following information to be shared with our community:
Auckland Transport will be repairing a slip outside 28 Tanekaha Road from early March 2026. A FULL ROAD CLOSURE WILL BE IN PLACE.
Families from Tanekaha Road, Miha Road, The Parade, and Okewa Road, Titirangi will be affected by this road closure.
During the first approximately 10 weeks of repair, there will be no vehicle access through the site from 8.30am to 12pm and 12.30pm to 5.30pm.
School buses will be allowed through in the morning before the works start, and in the afternoon students will be walked through the site while works are halted (Note: GBHS school buses are NOT affected).
AT Engagement (AT) would like to let families know in advance about this full road closure, so that they may plan ahead should they need to collect students who may become unwell or injured during the school day.
Any questions about this road closure should be directed via email to: [email protected]